Wednesday, November 19, 2014

TREE WORK ON HOLE 2

We are clearing trees on hole 2 to improve the playability of the hole. It is a very tight hole and the trees took away from the hole. We are systematically removing trees while making sure we protect the integrity of the architect's vision of the hole.  We will be working on the hole this week and I will post pictures of the finished product.  We will follow up in a few weeks with a stump grinder to remove the stumps and prepare the area for seed or sod.  We are going to work on 3 tee box next followed by holes 1 and 18.